October 2007 |
|
Chris - Create a trail and picnic/outdoor worship area
The project included clearing and mulching a trail, clearing a 75' by 75' area, building three picnic tables, and building a 4' by 4' brick fireplace area. For access and safety, Chris added a small foot-bridge over a drainage ditch. He chose to lead this project at his church becaue he wanted to provide a different setting for his youth group and Sunday School classes to gather and worship. He also wanted to give back to the church that has supported his youth group and given him a great opportunity to be a part of a great church family and to be a Scout.
|
 |
|
 |
|
 |

December 2006 |
|
Taylor - Storage building refurbish
Taylor chose to refurbish the Pre-school storage building.
|
 |
|
 |
|
 |

October 2006 |
|
Chase - Upgrade and Landscaping of Church Flagpole
Chase's project was to landscape and light the flagpole at Blair Road United Methodist Church. He and his work crews removed the current grass and landscaped the area with patio block, bushes and grass. Lighting was added to improve the display of the American Flag.
|
 |
|
 |
|
 |

August 2006 |
|
Jay - Repair of the church Sign
Jays project was to repair the main sign for Blair Road United Methodist Church. The Sign had fallen into disrepair and needed major replacement of wood. Jays work crews rebuilt the sign, landscaped the area and added lighting to the sign and landscaping.
|
 |
|
 |
|
 |

April 2005 |
|
Andrew Worthy - Mobile instrument racks
Andrews Project built 5 mobile instrument racks for Piedmont High Schools marching band. The Racks recycled wood removed from the band storage room and utilized support from the troop, church and high school to build the racks. Over 300 hours of service time was dedicated to this project by Andrew and his work crews.
|
 |
|
 |
|